EuP Page
The Energy Using Products Directive (EuP) will have a major impact on industry and for this reason this EuP page has been added to the seeba website. It will cover the developments within Europe and as it gets implemented within the individual member states it will cover this as well. The full text of the legislation can be seen on the Europa Website along with a lot of background information. Slide presentations covering the EuP can also be found in the Resource Centre
On the 21st November 2006 the Commission services held a workshop to inform stakeholders and Member States representatives on the implementation of the Ecodesign of EuPs directive. Copies of the summary presentations are as follows:
- Summary of the Workshop on implementation of the Ecodesign of EuP directive
- A framework for setting eco-design requirements for energy-using products
- Methodology for the Ecodesign of Energy-Using Products Directive (MEEuP)
- Synergies with other EU policies
- State of Play and Next Steps (Product studies)
- EuP Directive 2005/32/EC Next steps
In preparing for the EuP the EU Commission has set in motion a number of activities. They are:
- Eco-design of EuP methodology study: This has now been completed by VHK and the proposed methodology is based on a simplified life cycle annalysis where standardised data is used for each part of the life cycle. Details of the IVK study can be found on their website at http://www.vhk.nl/downloads.htm
- Mandate for programming standardisation work M 341 - EN: This work is being carried out by CENELEC to look at what standards are required to support the EuP.
- Preparatory Study Groups: A number of study groups have been set up to look at the first products to be covered by implementation measures under the EuP. These are:
- Boilers and combi-boilers (gas/oil/electric)
- Water heaters (gas/oil/electric)
- Personal Computers (desktops & laptops) and computer monitors
- Imaging equipment: copiers, faxes, printers, scanners, multifunctional devices
- Consumer electronics: televisions
- Standby and off-mode losses of EuPs
- Battery chargers and external power supplies
- Office lighting
- (Public) street lighting
- Residential room conditioning appliances (airco and ventilation)
- Electric motors 1-150 kW, water pumps (commercial buildings, drinking water, food, agriculture), circulators in buildings, ventilation fans (nonresidential)
- Commercial refrigerators and freezers, including chillers, display cabinets and vending machines
- Domestic refrigerators and freezers
- Domestic dishwashers and washing machines
During 2007 the following new preparatory study groups will be kicked off:
- Solid fuel small combustion installations
- Laundry driers
- Vacuum cleaners
- Simple Set-top boxes kicked off February 2007
- Complex Set-top boxes for pay content
- Domestic lighting
The stages followed by each of the study groups is shown below:
![]() |
Update on the Preparatory Study Groups
LOT 1: Boilers and combi-boilers (gas/electric)
The study group is being led by VHK and has the following timing plan:
- February 2006: Start of study
- April 2006: Presentations to stakeholders
- May 2006: First meeting of stakeholder experts
- October 2006: First draft interim report
- June-August 2007: Final draft report
- November 2007: Last date for approval of report by EU Commission.
The environmental analysis approach being taken by the study group is:
- Cradle to grave: Production, distribution, use, and end-of-life
- Uses indicators rather than LCA
- Impact categories given by the EU Commission.
- Use real data, not empty methodolgy
- Consistancy with legislation
- Expert and stakeholder conultation
- Sub tasks: Data retrieval, analysis, reporting
The progress to date has been:
- Workshop for experts held on the 2nd May 2006 Minutes
- Workshop for experts held on the 4th July 2006 Minutes SlidesBRG SlidesVHK
- Workshop for experts held on the 7th September 2006 Minutes SlidesVHK
- Workshop for experts held on the 28th November 2006 Minutes SlidesVHKSlidesOHara SlidesStella
- Task 1 Final Report - Definition, Test Standards, Current Legislation & Measures - 30 September 2007 [PDF 2 MB]
- Task 2 Final Report - Market Analysis - 30 September 2007 [PDF 400 kB]
- Task 3 Final Report - Consumer Behaviour & Local Infrastructure - 30 September 2007 [PDF 4,9 MB]
- Task 4 Final Report - Product System Analysis & Technical Analysis - 30 September 2007 [PDF 9.2 MB]
- Task 5 Final Report - Base Case - 30 September 2007 [PDF, 378 kB]
- Task 6 Final Report - Design Options - 30 September 2007 [PDF, 635 kB]
- Task 7 Final Report - Policies, Scenarios, Impact and Sensitivity Analysis - 30 September 2007 [PDF, 293 kB]
- Workshop for experts held on the 15th March 2007 Minutes, SlidesVHK, Slides BRG Consult.
- Workshop for experts held on the 23 May 2007 Minutes, Slides VHK
- Final Commission workshop : 11 September 2007 Minutes, Slides1 Slides2
LOT 2: Water heaters (gas/oil/electric)
The study group is being led by VHK and has the same timing plan as above. The progress to date has been:
- Workshop for experts held on the 2nd May 2006 Minutes SlidesVHK
- Workshop for experts held on the 4th July 2006 Minutes SlidesVHK SlidesBRG
- Workshop for experts held on the 7th September 2006 Minutes SlidesVHK SlidesBRG
- Workshop for experts held on the 28th November 2006 Minutes SlidesVHK
- Task 1 Final Report - Definition, Test Standards, Current Legislation & Measures - 30 September 2007 [PDF 1,6 MB]
- Task 2 Final Report - Market Analysis - 30 September 2007 [PDF 765 kB]
- Task 3 Final Report - Consumer Behaviour & Local Infrastructure - 30 September 2007 [PDF 2.4 MB]
- Task 4 Final Report - Technical Analysis - 30 September 2007 [PDF 8.3 MB]
- Task 5 Final Report - Definition of Base Case - 30 September 2007 [PDF, 643 kB]
- Task 6 Final Report - Design Options - 30 September 2007 [PDF, 702 kB]
- Task 7 Final Report - Policies, Scenarios, Impact and Sensitivity Analysis - 30 September 2007 [PDF, 370 kB]
- Workshop for experts held on the 15th March 2007 Minutes, SlidesVHK, Slides BRG Consult
- Workshop for experts held on the 23rd May 2007 Minutes, Slides VHK
- Final Commission workshop : 10 September 2007 Minutes, Slides1 Slides2
LOT 3: Personal Computers (desktops & laptops) and computer monitors
The study group is being led by IVF. The progress to date has been:
- Workshop held on the 30th May 2006 Slides
- Final Report, Tasks 1-8 - Personal Computers (desktops and laptops) and Computer Monitors - 19 September 2007 [PDF 2.1 MB]
- stakeholder Meeting 20th April 2007. Minutes, Slides
LOT 4: Imaging equipment: copiers, faxes, printers, scanners, multifunctional devices
The study group is being led by Fraunhofer IZM and has the following timing plan:
- 23 February 2006: Project Launch
- 1 March 2006: First meeting EC
- 7-8 March and 20-21 March 2006: Meeting with industrial partners, Berlin
- February 2007: Interim Report
- August 2007: Draft Report
The progress to date has been:
- Workshop held on the 8th November 2006 Slides
- Task 1, Draft Final Report - Definition - 24 July 2007 [PDF]
- Task 2, Draft Final Report - Economic and Market Analysis - 28 August 2007 [PDF]
- Task 3, Draft Final Report - Consumer Behavior and Local Infrastructure - 28 August 2007 [PDF]
- Task 4, Draft Report - Technical Analysis - 28 August 2007 [PDF]
- Task 5, Draft Report - Definition of Base Cases - 28 August 2007 [PDF]
- Task 6, Draft Report - Technical Analysis BAT - 28 September 2007 [PDF]
- Task 7, Draft Report - Improvement Potential - 28 September 2007 [PDF]
- Stakeholder meeting - 24 October 2007 Minutes Slides
LOT 5: Consumer electronics: televisions
The study group is being led by Fraunhofer IZM and has the following timing plan:
- 23 February: 2006 Project Launch
- 1 March 2006: First meeting EC
- 7-8 March and 20-21 March 2006: Meeting with industrial partners, Berlin
- November 2006: Interim Report
- February 2007: Draft Report
The progress to date has been:
- Workshop was held in March as per timing plan
- Task 1, Final Report - Definition - 2 August 2007 [PDF]
- Task 2, Final Report - Economic and Market Analysis - 2 August 2007 [PDF]
- Task 3, Final Report - Consumer Behaviour and Local Infrastructure - 2 August 2007 [PDF]
- Task 4, Final Report - Technical Analysis - 2 August 2007 [PDF]
- Task 5, Final Report - Definition of Base Cases - 2 August 2007 [PDF]
- Task 6, Final Report - Technical Analysis BAT - 2 August 2007 [PDF]
- Task 7, Final Report - Improvement Potential - 2 August 2007 [PDF]
- Task 8, Final Report - Scenario, Policy, Impact, and Sensitivity Analysis - 6 August 2007 [PDF]
- Stakeholder Comments - 6 August 2007 [PDF]
- Stakeholder meeting 3rd May 2007. Minutes, Slides
LOT 6: Standby and off-mode losses of EuPs
The study group is being led by Fraunhofer IZM and has the following timing plan:
- 23 February: 2006 Project Launch
- 1 March 2006: First meeting EC
- 7-8 March and 20-21 March 2006: Meeting with industrial partners, Berlin
- November 2006: Interim Report
- February 2007: Draft Report
The progress to date has been:
- Request for input regarding Best Available Technologies 23 February 2007
- Slides covering the current status of Lot 6 (Tasks 1-5) 23 February 2007
- Cover, Final Report - 2 October 2007 [PDF]
- Task 1, Final Report - Definition - 2 October 2007 [PDF]
- Task 2, Final Report - Economic and Market analysis - 2 October 2007 [PDF]
- Task 3, Final Report - Consumer behaviour and local infrastructure - 2 October 2007 [PDF]
- Task 4, Final Report - Technical Analysis of Existing Products - 2 October 2007 [PDF]
- Task 5, Final Report - Definition of Base Case - 2 October 2007 [PDF]
- Task 6, Final Report - Technical Analysis BAT - 2 October 2007 [PDF]
- Task 7, Final Report - Improvement Potential - 2 October 2007 [PDF]
- Task 8, Final Report - Improvement Potential - 2 October 2007 [PDF]
- Literature and Annexes For Task Reports - 2 October 2007 [PDF]
- Abridged and Commented Feedback List [PDF]
- Stakeholders meeting 4th May 2007. Minutes, Slides
The Consultation Forum has started working on this Lot, and the following is its progress:
LOT 7: Battery chargers and external power supplies
The study group is being led by Fraunhofer IZM and has the following timing plan:
- 23 February 2006: Project Launch
- 1 March 2006: First meeting EC
- 7-8 March and 20-21 March 2006: Meeting with industrial partners, Berlin
- August 2006: Interim Report
- November 2006: Draft Report
- November/December 2006: Stakeholders Meeting, Paris
- January 2007: Final report
The progress to date has been:
- Workshop were held in March as per timing plan
- A stakeholder meeting will be held in Brussels on the 15th December 2006, Minutes/Slides [Zip 1.34MB]
- Final Report 23rd January 2007 [PDF]
LOT 8: Office lighting
The study group is being led by VITO and has the following timing plan:
- 6 June 2006: ELC/CELMA expert meeting Brussels (Sheraton)
- 15 December 2006: Interim report
- 15 March 2007: Final report
- TBD: Meeting and presentation of final report
The progress to date has been: (Registration required to access reports)
- The expert was held on the 12th May 2006
- Expert meeting 2nd April 2007
- Final Report - Office lighting - April 2007 [PDF]
- Project Report - Office Lighting - July 2007 [PDF]
LOT 9: (Public) street lighting
The study group is being led by VITO and has the following timing plan:
- 6 June 2006: ELC/CELMA expert meeting Brussels (Sheraton)
- January 2007 : Meeting and presentation of final report
The progress to date has been: (Registration required to access reports)
- The expert was held on the 12th May
- 18 December 2006: stakeholder meeting in Brussels
- Final Report - Public street lighting - January 2007 [PDF]
- Final Project Report - Public street lighting 12 March 2007 [PDF]
The Consultation Forum has started working on this Lot, and the following is its progress:
- Working document on potential Eco-design requirements for Public Street Lighting - 22 June 2007 [PDF]
- Presentation on Street lighting Working Document - 22 June 2007 [PDF]
LOT 10: Residential room conditioning appliances (airco and ventilation)
The study group is being led by ARMINES (France) and has the following timing plan
- March 2006 Project Launch
- 6 April 2006 1st Meeting with EC
- 8 Sept. 2006 1st Stakeholders Meeting
- 30 Jan 2007 Task 1 and Task 2 reports. Task 3 and Task 4 draft version
- 13 Feb. 2007 2nd Stakeholders Meeting (date to be confirmed or delayed on January 30th)
- Feb. 2007 Interim Report (covering Task 1 - 4)
- April 2007 Task 3 and Task 4 reports
- Jul - Aug 2007 Advanced draft reports of Task 5 to Task 8
- Aug 2007 3rd Stakeholders Meeting
- September 2007 Draft Final Report October 2007 Final Report
The progress to date has been: (Registration required to access reports)
- The Kick off meeting was held on 8th September 2006 Minutes
- Stakeholders meeting 21st May 2007 Minutes
- 3rd Stakeholders Meeting 23rd October 2007 Minutes
Room air conditioners
- Task 1, Draft Report, V5 - Product definition, standards and legislation - August 2007 [PDF]
- Task 2, Draft Report, V5 - Economic and Market analysis - October 2007 [PDF]
- Task 3, Draft Report, V3 - Consumer Behaviour and Local Infrastructure - October 2007 [PDF]
- Task 4, Draft Report, V4 - Technical Analysis of Existing Products - October 2007 [PDF]
- Task 5, Draft Report, V4 - Definition of Base Case - October 2007 [PDF]
Residential Ventilation
Comfort fans
LOT 11: Electric motors 1-150 kW, water pumps (commercial buildings, drinking water, food, agriculture), circulators in buildings, ventilation fans (nonresidential)
The study group is being led by AEA Technology Environment and has the following timing plan:
- June 2006: Report 1 (Draft for stages 1-3 and 4-5)
- 29th June: Stakeholders meeting
- November 2006: Report 2 (final for stages 1-3, interim for 4-5 and draft for 6-7)
- December 2006: Stakeholder Meeting 2
- March 2007: Report 3 (final for stages 4-5 and 6-7, draft for stage 8)
- March 2007: Stakeholder Meeting 3
- July 2007: Report 4 (final for stage 8)
- July-August 2007: Stakeholder Consultation
- October 2007: Final Report
The progress to date has been:
- Lot 11 Interim Report: Introduction April 2007 [PDF]
Electric motors 1-150kW
- Motors, Inception Report 1.1 20th June 2006 [PDF]
- Motors 1st inception report stakeholder meeting presentation 29th June 2006 [PDF]
- Motors 1st inception report stakeholders meeting outcomes 29th June 2006 [PDF]
- Motors, Inception Report 2 28th November 2006 [PDF]
- Motors 2nd inception report stakeholder meeting presentation 6th December 2006 [PDF]
- Motors 2nd Stakeholder meeting, Outcomes 6th December 2007
- Motors Interim Report 2nd April 2007 [PDF]
- Motors Draft Final Report 16th October 2007 [PDF]
- Final Stakeholder Meeting Presentation 25 October 2007 [PDF]
- Final Stakeholder Meeting Outcomes 25 October 2007 [PDF]
Water Pumps
- Water Pumps, Inception Report 1.1 21st June 2006 [PDF]
- Pumps 1st inception report stakeholder meeting presentation 29th June 2006 [PDF]
- Pumps 1st inception report stakeholder meeting outcomes 29th June 2006 [PDF]
- Data requested for the MEEUP model 24th July 2006 [PDF]
- Water Pumps, Preparatory Studies Report No.2 October 2006 [PDF]
- Water Pumps 2nd Stakeholder meeting, Outcomes 21st November 2006 [PDF]
- Water pumps Draft Final Report 15th October 2007 [PDF]
- Final Stakeholder Meeting Presentation 25 October 2007 [PDF]
- Final Stakeholder Meeting Outcomes 25 October 2007 [PDF]
Circulators in buildings
- Circulators in buildings, Preparatory Studies 1.1 21st June 2006 [PDF]
- Circulators 1st inception report stakeholder meeting presentation 29th June 2006 [PDF]
- Circulators 1st inception report stakeholder meeting outcomes 29th June 2006 [PDF]
- Data requested for the MEEUP model 24th July 2006 [PDF]
- Circulators in Buildings, Preparatory Studies Report No 2 November 2006 [PDF]
- Circulators 2nd Stakeholder meeting, Outcomes 21st November 2006
- Circulators Draft Final Report 10 October 2007 [PDF]
- Final Stakeholder Meeting Presentation 24 October 2007 [PDF]
- Final Stakeholder Meeting Outcomes 24 October 2007 [PDF]
Ventilation fans
- Fans, Inception Report 1.1 June 2006 [PDF]
- Fans First inception report stakeholder meeting presentation 29th June 2006 [PDF]
- Fans 1st inception report stakeholder meeting outcomes 7th July 2006 [PDF]
- Fans, Preparatory Studies Report No 2 October 2006 [PDF]
- Fans Second inception report stakeholder meeting presentation 5th December 2006 [PDF]
- Fans 2nd inception report stakeholder meeting outcomes 5th December 2006 [PDF]
- Ventilation Fans Draft Final Report October 2007 [PDF]
- Final Stakeholder Meeting Presentation 24 October 2007 [PDF]
LOT 12: Commercial refrigerators and freezers, including chillers, display cabinets and vending machines
The study group is being led by BIO Intelligence Service and has the following timing plan:
- 23 February 2006: Project Launch
- 1 March 2006: First meeting EC
- End of June 2006: Meeting with industrial partners, Paris
- February 2007: Interim Report
- October 2007: Final Report
The progress to date has been:
- 27th June meeting with industrial partners Minutes Slides [2.14MB ZIP]
- Tasks 1-7, Draft Final Report - Commercial refrigerators and freezers - 8 August 2007 [PDF]
- Interim Stakeholder Meeting. 29th March 2007 Minutes [PDF], Presentation [Zip]
- Final Stakeholder Meeting 1st October 2007 Minutes Presentation
LOT 13: Domestic refrigerators and freezers
The study group is being led by Ecocold and has the following timing plan: (Registration required to access reports)
- July 2006: Project Launch
- 28th September 2006: Stakeholder kickoff meeting
- February 2007: Interim Report
- September 2007: Final Report
The progress to date has been:
- Meetings 28th October 2006, 5-6 Feb 2007
- Task 1 Documents Rev 4 11 September 2007
- Task 2 Documents 6 August 2007
- Task 3 Documents 20 May 2007
- Task 4 Documents 6 August 2007
- Task 5 Documents 13 November 2007
- Task 6 Documents 11 November 2007
- Task 7 Documents 25 September 2007
- Expert Meeting 5-6th February 2007
- Final Meeting 1st October 2007
LOT 14: Domestic dishwashers and washing machines
The study group is being led by Ecowet and has the following timing plan: (Registration required to access reports)
- July 2006: Project Launch
- 28th September 2006: Stakeholder kickoff meeting
- February 2007: Interim Report
- September 2007: Final Report
The progress to date has been: (Registration required to access reports)
- Meetings 29th October 2006, 5-6th February 2007, 13th April 2007, 1st October 2007
- Task 1 Documents 20 July 2007
- Task 2 Documents 6 August 2007
- Task 3 Documents 13 June 2007
- Task 4 Documents 6 August 2007
- Task 5 Documents 13 November 2007
- Task 6 Documents 11 November 2007
- Task 7 Documents 25 September 2007
No LOT Number : Simple Converter Boxes for digital television
The study group is being led by MVV Consultring GmbH. Unlike the other studies it was not put out to tender and therefore has no LOT number or documented timing plan.
This study is be completed in a very short time (some reports say within 3 months) because of the potentially large but comparatively transient market for the Simple Set top box product genre under examination.
- Task 1 - Definition documents 24 August 2007
- Task 2 - Economic & Market Analysis 3 October 2007
- Task 3 - Consumer Behaviour & Local Infrastructure documents 9 October 2007
- Task 4 - Product System Analysis documents 3 October 2007
- Task 5 - Definition of Base-case documents 9 October 2007
- Task 6 - Technical Analysis documents 9 October 2007
- Task 7 - Final Analysis documents 12 October 2007
- Task 8 - Policy documents 12 November 2007
- Stakeholder Meeting 17th October 2007 Presentation Overview
LOT 15: Solid Fuel Small Combustion Installations
The study group is is being conducted by a consortium led by Bio Intelligence Service (FR), including AEA Technology Energy & Environment (UK) and Institute of Thermal Technology of the Silesian University of Technology (PL)
- September 2007: Project Launch
- July 2009: Final Report
LOT 18: Complex Set Top Boxes (with conditional access and/or functions that are always on)
The study group is being led by Bio Intelligence Service (FR), including Fraunhofer IZM (DE).
- September 2007: Project Launch
- November 2008: Final Report
LOT 19: Domestic Lighting
The study group is is being led by VITO (http://www.vito.be/) with Biois (http://uk.biois.com) and Energy Piano as partners and Kreios engineering for general support and Laborelec (http://www.laborelec.com/) for reflector lamp measurements as subcontractors.
- September 2007: Project Launch
The EuP Page is researched and maintained by Graham Adams, seeba co-ordinator